DiscoverMaster The NEC - PODCASTAsk Paul | MC Cables in PVC Raceway "Sleeves"
Ask Paul | MC Cables in PVC Raceway "Sleeves"

Ask Paul | MC Cables in PVC Raceway "Sleeves"

Update: 2024-11-08
Share

Description

We will be installing a dozen or so MC cables (PVC jacketed) from a generator to various equipment (power, controls, instrumentation). The customer has requested that we install PVC sleeves to get into the foundation and in to the block out. No issues here. The sleeve would be approximately 15' in length. We will group MC cables into various sleeves to save on space since we have limited room in the blockout. Would ampacity adjustments to the power cables apply in this situation?

Become a supporter of this podcast: https://www.spreaker.com/podcast/master-the-nec-podcast--1083733/support.
Comments 
loading
00:00
00:00
1.0x

0.5x

0.8x

1.0x

1.25x

1.5x

2.0x

3.0x

Sleep Timer

Off

End of Episode

5 Minutes

10 Minutes

15 Minutes

30 Minutes

45 Minutes

60 Minutes

120 Minutes

Ask Paul | MC Cables in PVC Raceway "Sleeves"

Ask Paul | MC Cables in PVC Raceway "Sleeves"

Paul W. Abernathy